SLB has chosen the turnkey solution by Celsius Energy which has a much smaller footprint than a conventional installation. It includes a well with 10 probes 150 m deep, a technical room with a geothermal heat pump and a digital energy management solution. The total surface footprint of the solution is approximately 14 square meters, or just a little smaller than two parking spots. The entire construction, from feasibility study to delivery, was completed in six months. Further, the construction did not disrupt regular activity throughout the building, which often sees up to 200 employees per day.